BAYSWATER TRAIN STATION; BAYSWATER ACCIONA
Location
Bayswater Train Station
Client
ACCIONA - Evolve Bayswater Alliance (EBA); WA
Steelworks carried out:
• Detailed excavation,
• Form, Reinforcement Installation and Concrete pouring for the Stage 2 Concourse Level.
The works had to be carried out on an accelerated program working through dayshift and night shifts with 3 crews on rotation.
Steelworks mitigated program by managing design changes efficiently. Strict adherence to specifications and QA / QC were achieved through a dedicated site team that included a full-time project manager, site supervisor, contract administrator and site-based project engineer. Client change requests included the additional scope such as FRP to retaining walls, in situ fire water tanks, patch, kerbing, patching of precast elements and erection of structural steel. Considering the tight program and station opening deadline for stage 1, the team at Steelworks worked in harmony with EBA Station and Structures teams to achieve the critical milestones.