top of page
TRAIN REFUELER - CAPE LAMBERT
Location
Cape Lambert, Pilbara Region
Client
Rio Tinto
Steelworks carried out:
• All bulk earthworks,
• Detailed excavation,
• Form,
• Reinforcement installation and concrete pouring, along with a new build structure of a locomotive trip services and refuelling facility.
Consisting of the construction of a new locomotive shed; installation of foundations and plinths for eight 110 kl diesel fuel tanks; pipe reticulation rack footings, Pipe Bridge foundations and footings in close proximity to rail corridor, oily water separator, water treatment and tailing ponds - plinths, pads, foundations, and associated earthworks.
bottom of page